In short
- Complete exit lists for I-95, I-85 and I-40 are on separate pages, using the current mile-based exit numbers.
- Since June 30, 2022 the southern half of the Durham Freeway is I-885 and the Triangle Expressway's NC 147 section, I-40 to NC 540, is NC 885; NC 147 still covers about eight miles from I-885 to I-85.
- Charlotte's I-485 loop has been complete since June 5, 2015, and its south Express Lanes opened on February 28, 2026.
- The final 10 miles of Complete 540 in eastern Wake County are under construction, with opening expected by late 2028.
The three long routes
The I-95 exit list follows the coastal plain for about 181 miles, the I-85 exit list connects Charlotte, Greensboro and Durham, and the I-40 exit list crosses the state from the Tennessee line to Wilmington. Each has its own page with every current exit number.
Beyond those, the state has built loops around its big cities and a handful of freeways that do not carry an interstate number. Status in the sections below is as of November 2026.
NC 147 and the Durham Freeway
The Durham Freeway runs through Durham, linking the downtown to I-85 on the north side and to Research Triangle Park on the south. It began with a 1962 bond referendum, and its first section opened in 1970. The route was designated NC 147 in 1986. Eastbound lanes of the extension toward I-85 opened on May 21, 1997, and the section connecting to I-85 followed on July 31, 1998. A southern extension, the Triangle Parkway, reached NC 540 on December 8, 2011.
The number changed in 2022. On June 30, 2022, after the East End Connector was finished, the southern half of the Durham Freeway, between I-40 and the East End Connector, became I-885, and the Triangle Expressway section between I-40 and NC 540 became NC 885. NC 147 remains on the rest of the freeway, about 8.1 miles from I-885 through downtown Durham to I-85 and US 70. Older maps and navigation data may still show NC 147 south of downtown. The old freeway corridor meets I-40 at exits 279A (NC 885 Toll) and 279B (I-885).
I-140 and the Wilmington bypass
I-140 is the 25.4-mile Wilmington bypass, a loop around the north side of the city that connects I-40 with US 17, US 74/76 and US 421. Its first segment opened on August 22, 2005. Two more segments followed on June 30, 2006, and the Brunswick County segment opened in September 2014. The last piece, from US 74/76 to US 421, was ribbon-cut on December 15, 2017 and opened to traffic on December 19, 2017. It cost $204 million and includes two 1.4-mile bridges over the Cape Fear River.
West of I-40, the route was signed NC 140 until August 7, 2018, when I-140 replaced it. The east end meets I-40 at exit 416. A further river crossing, called Cape Fear Crossing, has been discussed but has no construction funding.
I-485 around Charlotte
I-485 is Charlotte's 66.68-mile outer loop. Groundbreaking was on July 8, 1988, and the first section opened on November 1, 1990. The last segment, between I-77 and I-85 near UNC Charlotte, opened on June 5, 2015, completing the circle. Major junctions include I-77, I-85 and US 74.
The loop's newest change is the south Express Lanes, which carry optional tolls between US 74 and I-77. Construction started in summer 2019 on this roughly 17-mile section, and the lanes opened on February 28, 2026. Toll rates vary by time of day and vehicle size, and drivers without an NC Quick Pass pay more. West-side Express Lanes have been proposed, but only preliminary engineering appears in the 2026-2035 state program.
I-540, the Triangle Expressway and Complete 540
I-540 runs about 26 miles around the north side of Raleigh, from I-40 near Raleigh-Durham airport (exit 283) to I-87/US 64/US 264 at Knightdale. It is toll-free. The tolled NC 540 Triangle Expressway continues from the same I-40 junction toward Morrisville and Apex; its first section was built in stages from December 2011 to December 2012 and financed with about $625 million in bonds and a $387 million federal loan.
The gap between Apex and Knightdale is being closed in two phases. The first phase, about 18 miles from NC 55 in Apex to I-40/I-42 near Garner, opened on September 25, 2024. Phase 2, about 10 miles from I-40/I-42 to I-87/US 64/US 264, broke ground in May 2024 and carries a price near $740 million. Opening is expected by late 2028.
I-440 and the Raleigh Beltline
The Raleigh Beltline was planned in the early 1950s. The earliest segment dates to 1959, and the loop was complete by 1984. I-440, 16.4 miles long today, was officially designated along the whole ring on July 16, 1991, with the southern half signed together with I-40. That arrangement ended on November 10, 2008, when I-440 was cut back so that it begins at I-40/US 1/US 64 (exit 293) and ends near I-40/I-87 at exit 301. The old inner and outer labels became east and west.
The Fortify project rebuilt crumbling concrete from 2013, with the main phases finishing in 2015 and 2018. Today the Beltline works as I-440 on the north and east, and as I-40 on the south.
US 1 across North Carolina
US 1 covers 174.1 miles in North Carolina, across the central part of the state, entering from South Carolina southwest of Rockingham. The original road was part of the Capital Highway. It became NC 50 in 1922 and US 1 in 1926. The Raleigh freeway was finished around 1963, and later projects added bypasses and widening, including a new Vass-Cameron bypass in June 2005 and widening from six to eight lanes on the shared US 1/US 64 section at Cary in 2006.
A plan to number the Raleigh-to-Sanford corridor as I-140 was rejected by AASHTO on April 17, 1999. In Raleigh, US 1 shares the Beltline with I-440 from exit 1 to Capital Boulevard (US 401), exit 11.
US 15-501 between Chapel Hill and Durham
US 15 and US 501 run together for about 106 miles across central North Carolina, from Laurinburg through Aberdeen, Pinehurst, Carthage, Sanford, Pittsboro, Chapel Hill and Durham, where they split at I-85. The pair is known locally as 15-501, and US 15 mileposts are used. US 15 itself is 159 miles long in North Carolina and was set up in 1927 on the alignment of NC 75.
The best-known part is the expressway between Chapel Hill and Durham, which links UNC and Duke and meets I-40 at exit 270. In Durham, the freeway portion ends at US 15 Business and US 501 Business, with a Gregson Street junction at the north end of the US 501 overlap. A 2023 AASHTO approval rerouted US 15 through Pittsboro along NC 87 and US 64, and NCDOT finished the change in May 2025. NCDOT project U-5717 would turn the Garrett Road intersection in Durham into an interchange, with construction listed for October 2029.
Frequently asked questions
Which North Carolina interstates have full exit lists here?
I-95, I-85 and I-40 each have a full exit list on their own page, using current exit numbers. Shorter loops and freeways such as I-485, I-440, I-540, I-140, US 1 and US 15-501 are summarized on this page with their length, history and status, rather than listed exit by exit.
What happened to NC 147 in Durham?
NC 147 still exists, but it is shorter. On June 30, 2022 the Triangle Expressway section south of I-40 became NC 885, and the Durham Freeway between I-40 and the East End Connector became I-885. NC 147 now runs about 8.1 miles from I-885 through downtown Durham to I-85 and US 70. Older maps may still show NC 147 on the southern part.
Is I-540 a toll road?
I-540 itself is not tolled. The Triangle Expressway, signed NC 540 Toll, is tolled, and so is Phase 2 of Complete 540 from I-40/I-42 near Garner to Knightdale when it opens. Tolls are collected electronically, with lower rates for NC Quick Pass holders than for bills sent by mail.
When did the I-485 loop around Charlotte open?
The first section opened on November 1, 1990, and the final segment between I-77 and I-85 near UNC Charlotte opened on June 5, 2015. That completed the 66.68-mile loop. Optional toll Express Lanes on the south side between US 74 and I-77 opened on February 28, 2026.
What is I-140 near Wilmington?
I-140 is a 25.4-mile bypass of Wilmington, officially named the John Jay Burney Jr. Freeway. It runs from US 17 near Winnabow, crosses the Cape Fear and Northeast Cape Fear rivers and ends at I-40, where the road continues east as NC 140 to US 17 in Kirkland. The first section opened in August 2005.
Sources
- NCDOT: Complete 540 project page
- NCDOT: Turnpike Authority, Triangle Expressway
- NCDOT: I-485 Express Lanes open, February 27, 2026
- Wikipedia: North Carolina Highway 147
- Wikipedia: Interstate 485
- Wikipedia: U.S. Route 1 in North Carolina
- Wikipedia: U.S. Route 15-501
- NCDOT public input: US 15-501 and Garrett Road interchange (U-5717)
- Wikipedia: Interstate 540 (North Carolina)
- Wikipedia: Interstate 140 (North Carolina)
- Wikipedia: Triangle Expressway